Project Category: Housing/Lodging
Client: Norfolk District, Army Corps of Engineers Architect: Burgess & Niple Virginia Beach, VA
Project Delivery: Design-Build
|
Barracks 1002 and 1004 Fort Eustis, Virginia
|
|
![]() Barracks 1002 Contract Amount: $3.5 Million Contract Completion: May 2005
|
Team Tesoro upgraded and
renovated a 1950’s era, 52,000 square-foot, three-story barracks.
The design featured spacious sleeping areas, combination
restroom/showers, storage rooms, and common areas. The scope
included new wood and metal doors, casework, CMU block walls with
custom wall finishes, accessories, heating, cooling, lighting,
power, communications, and fire protection systems, along with DOD
anti-terrorism/force protection measures. This project, which was completed four months ahead of schedule, was cited by the client as the quality standard for other projects at Fort Eustis.
|
|
|
Team Tesoro upgraded and renovated this 50,000 square-foot, three-story barracks used by soldiers for 16 weeks of advanced training following basic training. The work included demolition of existing vinyl composition tile (VCT) flooring, acoustical tile ceilings, carpet, windows, and steel cabinetry. New construction consisted of windows, wood doors, metal doors, CMU block walls, painting, shower rooms, special wall finishes, carpet, VCT flooring, display boards, display cabinets, postal specialties, and telephone room. New power distribution, lighting systems, fire alarm system, mechanical system, and new plumbing were also included in the renovations. This project was completed six weeks ahead of schedule. |
Barracks 1004 Contract Amount: $2.8 Million Contract Completion: Oct 2002
![]()
|